- Verified all acceptance criteria for Stories 1.1-1.6 - Updated Status fields from Pending to Completed - Marked all acceptance criteria checkboxes as completed - All stories in Epic 1 are now fully implemented and verified
Epic 0: Project Setup & Foundation
Overview
Initialize repository structure with proper Go project layout, implement configuration management system, establish structured logging system, set up CI/CD pipeline and development tooling, and bootstrap dependency injection and application entry point.
Stories
0.1 Project Initialization and Repository Structure
- Story: 0.1 - Project Initialization
- Goal: Establish a properly structured Go project with all necessary directories, configuration files, and documentation.
- Deliverables: Go module initialization, complete directory structure, .gitignore, comprehensive README.md
0.2 Configuration Management System
- Story: 0.2 - Configuration Management System
- Goal: Implement a flexible configuration system that loads settings from YAML files, environment variables, and supports type-safe access.
- Deliverables: ConfigProvider interface, Viper implementation, configuration files, DI integration
0.3 Structured Logging System
- Story: 0.3 - Structured Logging System
- Goal: Implement a production-ready logging system with structured JSON output, request correlation, and configurable log levels.
- Deliverables: Logger interface, Zap implementation, request ID middleware, context-aware logging
0.4 CI/CD Pipeline and Development Tooling
- Story: 0.4 - CI/CD Pipeline and Development Tooling
- Goal: Establish automated testing, linting, and build processes with a developer-friendly Makefile.
- Deliverables: GitHub Actions workflow, comprehensive Makefile, build automation
0.5 Dependency Injection and Application Bootstrap
- Story: 0.5 - Dependency Injection and Application Bootstrap
- Goal: Set up dependency injection container using Uber FX and create the application entry point that initializes the platform.
- Deliverables: DI container, FX providers, application entry point, lifecycle management
Deliverables Checklist
- Repository structure in place
- Configuration system loads YAML files and env vars
- Structured logging works
- CI pipeline runs linting and builds binary
- Basic DI container initialized
Acceptance Criteria
go build ./cmd/platformsucceedsgo test ./...runs (even if tests are empty)- CI pipeline passes on empty commit
- Config loads from
config/default.yaml - Logger can be injected and used
- Application starts and shuts down gracefully
Implementation Summary
- Implementation Summary and Verification Instructions - Complete guide on how to verify all Epic 0 functionality