- Add comprehensive 8-phase implementation plan (docs/plan.md) - Add 28 Architecture Decision Records (docs/adr/) covering all phases - Add task tracking system with 283+ task files (docs/stories/) - Add task generator script for automated task file creation - Add reference playbooks and requirements documentation This commit establishes the complete planning foundation for the Go Platform implementation, documenting all architectural decisions and providing detailed task breakdown for Phases 0-8.
862 B
862 B
Task 2.1.5: Add login endpoint: POST /api/v1/auth/login
Metadata
- Task ID: 2.1.5
- Title: Add login endpoint:
POST /api/v1/auth/login - Phase: 2 - Authentication & Authorization
- Section: 2.1
- Status: Pending
- Priority: High
- Estimated Time: TBD
- Dependencies: TBD
Description
Add login endpoint: POST /api/v1/auth/login
Requirements
- Add login endpoint:
POST /api/v1/auth/login
Implementation Steps
- TODO: Add implementation steps
- TODO: Add implementation steps
- TODO: Add implementation steps
Acceptance Criteria
- Task 2.1.5 is completed
- All requirements are met
- Code compiles and tests pass
Related ADRs
- See relevant ADRs in
docs/adr/
Implementation Notes
- TODO: Add implementation notes
Testing
# TODO: Add test commands
go test ./...